The purpose of this program is to order printout of structure/operation lists.
- Item
- Warehouse
- This field is only displayed if the Warehouse in BOM field is set to YES in the MFG control file.
- Variant
- Report option
- The code indicates the report type to be printed.
Code Description 1 Material, one level 2 Material, details (all levels) 3 Material, where used 4 Operations
- Change date
- This field is only displayed when Log BOM/BOR changes is set to YES in the MFG control file. This is the date in passed time that the structure report should be based on.
This field is only allowed in combination with report option 1 (Material, one level) and 4 (Operations).