The purpose of this program is to define planned calibration dates. Note: This can only be done for tools where the Calibration identifier is set to 6 (Defined calibration dates). The calibration date is the date when the calibration of the tool should be performed.
Selection fields
- Tool
- The code and description that identify the tool.
- Date
- The calibration date.
- Week
- The number of the week.
- Day
- The day number of the week.
- Calibration
- Displays X, if the date is a planned calibration date. Note: It is also possible to manually define a date for when a calibration of a tool should be performed, by entering an X next to the appropriate date.