The purpose of this program is to create an enquiry file from the Item bill of material and from the Project bill of material. The structures should be coded with component category within the selected component category interval from the selection panel.
Note: The program starts to delete all already existing records in the enquiry file before the creation of the new enquiry file.
- Component category
- The component category interval (from-to) to be included. The system checks that the ending value is greater than or equal to the starting value. If all values are to be included leave this field blank.