From this program you can order a replanning report for pull-planning controlled items. The report can be created both for backward and forward planning.
- Requirement type
 - The code indicates what type of items should be included in the report. 
Code Description 1 Shortage 2 Priority  
- Replanning type
 - The code indicates which replanning type should be printed. 
Code Description 1 Backward scheduling 2 Forward scheduling  
- Planner
 - The planner the report should be selected for.
 
- Horizon date
 - The horizon date for forward scheduling.