This panel displays planned workload for a selected supply plan.
Options
Detail | Select this option to view all items that are included referring to the Workload column. |
Function keys
Switch run/machine | Toggle between viewing workload in run/labour or machine time. |
Minutes/Decimals | Toggle between hours and minutes and hours and decimals for the operation times. |
- Work centre
- The selected work centre.
- Workl type
- This is retrieved from the Work centre table.
- Total capacity
- The total capacity for the selected period interval. The calendar used is defined in the Work centre table.
- Total workload
- The total workload for the selected period interval.
- Work days
- Displays the number of working days for the period.
- Capacity
- The calendar capacity referring to the period.
- Workload
- The calculated workload referring to the period.
- %
- The calculated workload in comparison to the capacity in percentage.
- Acc capacity
- The accumulated capacity.
- Total workload
- The total workload.
- Acc %
- The total workload in comparison to the accumulated capacity in percentage.